A Homeowner’s Guide to Fiberglass Pool Installation: What to Expect with Rock N Roll Pools & Spas
At Rock N Roll Pools & Spas, we pride ourselves on a streamlined installation process that minimizes the disruption to your home while maximizing the quality of your new backyard retreat. Fiberglass pools offer a superior finish and a faster timeline than traditional builds.
Here is a step-by-step breakdown of how our team manages your installation from start to finish.
1. Site Evaluation and Design
The process begins with a detailed consultation. We assess your property’s topography, sun exposure, and utility access. During this phase, you will select your pool’s shell design—choosing the shape, color, and integrated features like tanning ledges or benches—while we finalize the layout of your surrounding patio.
2. Permits and Engineering
Before we break ground, our team handles the heavy lifting of local bureaucracy. We submit the necessary engineering plans and applications to your local municipality to secure building permits, ensuring your project is fully compliant with all safety and zoning regulations.
3. Precision Excavation
Once approved, we begin the excavation process. Using specialized machinery, we dig the pool site to exact specifications. We then install a meticulously leveled base of gravel or sand, which provides the stable foundation necessary to support the fiberglass shell.
4. Setting the Pool Shell
The most significant milestone is the delivery of your pool. A crane is used to lift the pre-fabricated shell and set it into the excavated site. Our technicians use laser-leveling tools to ensure the pool is perfectly positioned before moving to the next phase.
5. Plumbing and Electrical Integration
With the shell in place, we install the "life support" systems of the pool. This includes running heavy-duty PVC plumbing for filtration and returns, as well as the electrical wiring for your pump, heater, and LED lighting systems. All work is performed to meet or exceed industry standards.
6. Synchronized Backfilling and Filling
To ensure the structural integrity of the shell, we fill the pool with water while simultaneously backfilling the exterior with stone or gravel. This balanced approach equalizes pressure on the pool walls, preventing any shifting or bulging during the settling process.
7. Coping and Decking
The aesthetic transition from the pool to the yard is handled during this stage. We install the coping (the immediate border of the pool) followed by your chosen decking material—whether that be pavers, natural stone, or decorative concrete. This provides the finished, high-end look of your outdoor living space.
8. Equipment Commissioning
Our technicians install the filtration system, heater, and salt or chlorine feeders on a dedicated equipment pad. We prime the system, check for leaks, and ensure all components—including automation and lighting—are functioning perfectly.
9. Final Balancing and Handover
The final step is water chemistry. We balance the pool’s pH and sanitizer levels to ensure the water is safe and crystal clear. Finally, we provide you with a comprehensive "Pool School," teaching you how to easily manage your new pool so you can start enjoying it immediately.